Full electrification
of bus services in Biel/Bienne
3
Years

100%

Electrification by 2030
22 → 60
Expansion of the e-bus fleet
+20%
With minimal extension of existing infrastructure
Client
Verkehrsbetriebe Biel / Transports publics biennois
Project duration
2022 – 2025
Fleet size
Approx. 55 vehicles
Target
100% climate-neutral bus operation by 2030
Modules and results of the project

Project focus

Our contribution

Analysis
Detailed recording of timetables, stops, line profiles, energy demand and existing trolleybus infrastructure.
Simulation
Course-accurate simulations for schedules, charging windows, battery states and grid loads over a full operating year.
Evaluation
Comparison of fleet and infrastructure scenarios in terms of cost-efficiency, operational reliability and grid stability.
Recommendation
Preparation of a sound decision-making basis for electrification, incl. smart grid options and depot development.